International Space Station (ISS): Planning for the Extension of Utilization Through 2020, including Spare Parts, Safety, and Reliability - GAO Study of NASA Plans

Nonfiction, Science & Nature, Science, Physics, Astrophysics & Space Science
Cover of the book International Space Station (ISS): Planning for the Extension of Utilization Through 2020, including Spare Parts, Safety, and Reliability - GAO Study of NASA Plans by Progressive Management, Progressive Management
View on Amazon View on AbeBooks View on Kobo View on B.Depository View on eBay View on Walmart
Author: Progressive Management ISBN: 9781466070844
Publisher: Progressive Management Publication: March 2, 2012
Imprint: Smashwords Edition Language: English
Author: Progressive Management
ISBN: 9781466070844
Publisher: Progressive Management
Publication: March 2, 2012
Imprint: Smashwords Edition
Language: English

In 2010 the National Aeronautics and Space Administration (NASA) was authorized to extend the life of the International Space Station (ISS) from 2015 through at least September 30, 2020. Gauging the feasibility of doing so is quite complex. Among the factors to be assessed are the reliability of key components, NASA's ability to deliver spares to the ISS, the projected life of structures that cannot be replaced, and the health of systems that affect safety. While some empirical data exist, the ISS is a unique facility in space and assessing its extended life requires the use of sophisticated analytical techniques and judgments. GAO provided a preliminary report on NASA's use of such techniques in April 2011. For this review, GAO assessed the extent to which NASA has ensured essential spare parts are available and ISS structures and hardware are sound for continued ISS utilization through 2020. GAO interviewed NASA officials and outside experts; assessed the methodology underlying NASA's findings; conducted a limited test of data supporting NASA's assessments; and analyzed documentation such as ongoing assessments, schedules and other relevant efforts.

What GAO Found - NASA's approach to determining, obtaining, and delivering necessary spare parts to the ISS is reasonable to ensure continued utilization of the station through 2020. The statistical process and methodology being used to determine the expected lifetimes of replacement units is a sound and commonly accepted approach within the risk assessment community that considers both manufacturers' predictions and the systems' actual performance. To date NASA has given equal weight to manufacturers' predictions and actual performance, and currently has no plans to reassess this decision. However, as time goes on, the resulting estimates could prove to be overly conservative, given that NASA has found failure rates for replacement units to be lower than manufacturers' predictions. Therefore, continuing to weigh the manufacturers' predictions equally with actual performance could lead NASA to purchase an excess of spares. NASA also has a reasonable process for establishing performance goals for various functions necessary for utilization and determining whether available spares are sufficient to meet goals through 2020, but the rationale supporting these decisions has not been systematically documented.

View on Amazon View on AbeBooks View on Kobo View on B.Depository View on eBay View on Walmart

In 2010 the National Aeronautics and Space Administration (NASA) was authorized to extend the life of the International Space Station (ISS) from 2015 through at least September 30, 2020. Gauging the feasibility of doing so is quite complex. Among the factors to be assessed are the reliability of key components, NASA's ability to deliver spares to the ISS, the projected life of structures that cannot be replaced, and the health of systems that affect safety. While some empirical data exist, the ISS is a unique facility in space and assessing its extended life requires the use of sophisticated analytical techniques and judgments. GAO provided a preliminary report on NASA's use of such techniques in April 2011. For this review, GAO assessed the extent to which NASA has ensured essential spare parts are available and ISS structures and hardware are sound for continued ISS utilization through 2020. GAO interviewed NASA officials and outside experts; assessed the methodology underlying NASA's findings; conducted a limited test of data supporting NASA's assessments; and analyzed documentation such as ongoing assessments, schedules and other relevant efforts.

What GAO Found - NASA's approach to determining, obtaining, and delivering necessary spare parts to the ISS is reasonable to ensure continued utilization of the station through 2020. The statistical process and methodology being used to determine the expected lifetimes of replacement units is a sound and commonly accepted approach within the risk assessment community that considers both manufacturers' predictions and the systems' actual performance. To date NASA has given equal weight to manufacturers' predictions and actual performance, and currently has no plans to reassess this decision. However, as time goes on, the resulting estimates could prove to be overly conservative, given that NASA has found failure rates for replacement units to be lower than manufacturers' predictions. Therefore, continuing to weigh the manufacturers' predictions equally with actual performance could lead NASA to purchase an excess of spares. NASA also has a reasonable process for establishing performance goals for various functions necessary for utilization and determining whether available spares are sufficient to meet goals through 2020, but the rationale supporting these decisions has not been systematically documented.

More books from Progressive Management

Cover of the book 21st Century VA Independent Study Course: Medical Care of Persons with Spinal Cord Injury, Autonomic Nervous System, Symptoms, Treatment, Related Diseases, Motor Neuron Injury, Autonomic Dysreflexia by Progressive Management
Cover of the book China's Economic Development Plan in Xinjiang and How it Affects Ethnic Instability: Economic Development in the Xuar, Uyghurs, Silk Road, Central Asia Resources, Han Migrants, Destabilizing Factors by Progressive Management
Cover of the book Plant and Crop-based Biofuels and Industrial Biotechnology: Comprehensive World Survey of Biofuel Industries and Processes, Renewable Energy and Resources Roadmap by Progressive Management
Cover of the book 2012 U.S. Intelligence Community Threat Assessment on Global Water Security: Shortages, Floods, National Security Impact, Nile, Tigris-Euphrates, Mekong, Jordan, Indus, Brahmaputra, and Amu Darya by Progressive Management
Cover of the book Deadly Auroras? The Carrington Event Threat: Solar Superstorms and the Risk of Devastating Blackouts and Electric Grid Damage from Massive Geomagnetic Disturbances (GMD) by Progressive Management
Cover of the book 21st Century Peacekeeping and Stability Operations Institute (PKSOI) Papers - Mass Atrocity: Prevention and Response - A Mass Atrocity Response Operations (MARO) Workshop Report by Progressive Management
Cover of the book 21st Century U.S. Military Manuals: U.S. Marine Corps (USMC) Guide To Cold Weather Operations MCRP 3-35.1A (Value-Added Professional Format Series) by Progressive Management
Cover of the book Rockets and People, Volume III: Hot Days of the Cold War - Memoirs of Russian Space Pioneer Boris Chertok, ICBMs, Cuban Missile Crisis, Gagarin, Vostok and Soyuz, Lunar Landing (NASA SP-2005-4110) by Progressive Management
Cover of the book U.S. Army Medical Correspondence Course: Cardiac Rhythm Interpretation - Electrocardiogram, EKG, Dysrhythmia, Electrophysiology, Rhythms/Heart Blocks by Progressive Management
Cover of the book American Military History: A Selected Bibliography - Doctrine, Strategy, Tactics, Profiles of Command, Law of War, Lessons Learned, Rules of Engagement, Transformation and Reform, Study of History by Progressive Management
Cover of the book Historic Reclamation Projects: Project Skywater - Rainmaking, Weather Modification, History and Politics, Technology, Testing, and Implementation by Progressive Management
Cover of the book Competing Claims Among Argentina, Chile, and Great Britain in the Antarctic: Economic and Geopolitical Undercurrents - Treaty, Geopolitical Perspectives, U.S. Interests, Falklands Malvinas Conflict by Progressive Management
Cover of the book NASA Oral History Project: Part One - Shuttle-Mir Space Station with Russian Cosmonauts and American Astronauts, Featuring John Blaha, Frank Culbertson, Bonnie Dunbar, Joe Engle, and Bill Gerstenmaier by Progressive Management
Cover of the book 2017 U.S. Navy Force Structure Assessment (FSA) and the Request for a 355 Ship Navy, Shipbuilding Plans, Aircraft Carriers, Submarines, Nuclear Missiles, Surface Combatants, Destroyers, Trump Goals by Progressive Management
Cover of the book Department of Defense Chemical and Biological Defense Program - Comprehensive Reports on Military Efforts to Protect Against NBC, WMD, Chemical, Biological, Radiological, and Nuclear (CBRN) Threats by Progressive Management
We use our own "cookies" and third party cookies to improve services and to see statistical information. By using this website, you agree to our Privacy Policy