International Space Station (ISS): Planning for the Extension of Utilization Through 2020, including Spare Parts, Safety, and Reliability - GAO Study of NASA Plans

Nonfiction, Science & Nature, Science, Physics, Astrophysics & Space Science
Cover of the book International Space Station (ISS): Planning for the Extension of Utilization Through 2020, including Spare Parts, Safety, and Reliability - GAO Study of NASA Plans by Progressive Management, Progressive Management
View on Amazon View on AbeBooks View on Kobo View on B.Depository View on eBay View on Walmart
Author: Progressive Management ISBN: 9781466070844
Publisher: Progressive Management Publication: March 2, 2012
Imprint: Smashwords Edition Language: English
Author: Progressive Management
ISBN: 9781466070844
Publisher: Progressive Management
Publication: March 2, 2012
Imprint: Smashwords Edition
Language: English

In 2010 the National Aeronautics and Space Administration (NASA) was authorized to extend the life of the International Space Station (ISS) from 2015 through at least September 30, 2020. Gauging the feasibility of doing so is quite complex. Among the factors to be assessed are the reliability of key components, NASA's ability to deliver spares to the ISS, the projected life of structures that cannot be replaced, and the health of systems that affect safety. While some empirical data exist, the ISS is a unique facility in space and assessing its extended life requires the use of sophisticated analytical techniques and judgments. GAO provided a preliminary report on NASA's use of such techniques in April 2011. For this review, GAO assessed the extent to which NASA has ensured essential spare parts are available and ISS structures and hardware are sound for continued ISS utilization through 2020. GAO interviewed NASA officials and outside experts; assessed the methodology underlying NASA's findings; conducted a limited test of data supporting NASA's assessments; and analyzed documentation such as ongoing assessments, schedules and other relevant efforts.

What GAO Found - NASA's approach to determining, obtaining, and delivering necessary spare parts to the ISS is reasonable to ensure continued utilization of the station through 2020. The statistical process and methodology being used to determine the expected lifetimes of replacement units is a sound and commonly accepted approach within the risk assessment community that considers both manufacturers' predictions and the systems' actual performance. To date NASA has given equal weight to manufacturers' predictions and actual performance, and currently has no plans to reassess this decision. However, as time goes on, the resulting estimates could prove to be overly conservative, given that NASA has found failure rates for replacement units to be lower than manufacturers' predictions. Therefore, continuing to weigh the manufacturers' predictions equally with actual performance could lead NASA to purchase an excess of spares. NASA also has a reasonable process for establishing performance goals for various functions necessary for utilization and determining whether available spares are sufficient to meet goals through 2020, but the rationale supporting these decisions has not been systematically documented.

View on Amazon View on AbeBooks View on Kobo View on B.Depository View on eBay View on Walmart

In 2010 the National Aeronautics and Space Administration (NASA) was authorized to extend the life of the International Space Station (ISS) from 2015 through at least September 30, 2020. Gauging the feasibility of doing so is quite complex. Among the factors to be assessed are the reliability of key components, NASA's ability to deliver spares to the ISS, the projected life of structures that cannot be replaced, and the health of systems that affect safety. While some empirical data exist, the ISS is a unique facility in space and assessing its extended life requires the use of sophisticated analytical techniques and judgments. GAO provided a preliminary report on NASA's use of such techniques in April 2011. For this review, GAO assessed the extent to which NASA has ensured essential spare parts are available and ISS structures and hardware are sound for continued ISS utilization through 2020. GAO interviewed NASA officials and outside experts; assessed the methodology underlying NASA's findings; conducted a limited test of data supporting NASA's assessments; and analyzed documentation such as ongoing assessments, schedules and other relevant efforts.

What GAO Found - NASA's approach to determining, obtaining, and delivering necessary spare parts to the ISS is reasonable to ensure continued utilization of the station through 2020. The statistical process and methodology being used to determine the expected lifetimes of replacement units is a sound and commonly accepted approach within the risk assessment community that considers both manufacturers' predictions and the systems' actual performance. To date NASA has given equal weight to manufacturers' predictions and actual performance, and currently has no plans to reassess this decision. However, as time goes on, the resulting estimates could prove to be overly conservative, given that NASA has found failure rates for replacement units to be lower than manufacturers' predictions. Therefore, continuing to weigh the manufacturers' predictions equally with actual performance could lead NASA to purchase an excess of spares. NASA also has a reasonable process for establishing performance goals for various functions necessary for utilization and determining whether available spares are sufficient to meet goals through 2020, but the rationale supporting these decisions has not been systematically documented.

More books from Progressive Management

Cover of the book Encyclopedia of Military Space Operations at Cape Canaveral: From Early Ballistic Missile Launches in 1953 through Titan, Atlas, Delta, and EELV Launches with Mission Details by Progressive Management
Cover of the book Transformational Leaders and Doctrine in an Age of Peace: Searching for a Tamer Billy Mitchell - John Lejeune, Marine Corps Commandant, Admiral William Moffett, Fundamentally Redefining Air Doctrine by Progressive Management
Cover of the book Essential Guide to the Defense Security Service (DSS) - Personnel Security, Counterintelligence, Preventing Computer Espionage, Security Clearance, Improving Industrial Security by Progressive Management
Cover of the book Silk Chutes and Hard Fighting: U.S. Marine Corps Parachute Units in World War II - Lakehurst Training Center, Parachute Accidents by Progressive Management
Cover of the book U.S. Energy Sector Vulnerabilities to Climate Change and Extreme Weather: Increasing Temperatures, Storms, Flooding, and Sea Level Rise, Effects on Power Plants by Progressive Management
Cover of the book Hammer Down: The Battle for the Watapur Valley, 2011 - War in Afghanistan Vanguard of Valor Series, Fight Against Taliban and al-Qaeda, Task Force Cacti by Progressive Management
Cover of the book Complete Guide to the Abu Ghraib Iraq War Prison Abuse Scandal: Major Reports and Investigations, Analysis, Lessons Learned, Impact on Army Profession, Intelligence Process, Detainee Doctrine, Torture by Progressive Management
Cover of the book Psyop: Military Psychological Operations Joint Doctrine Guidance: Altering the Behavior of People in Enemy-Controlled Territory by Progressive Management
Cover of the book 21st Century FEMA Study Course: Emergency Support Function #10 Oil and Hazardous Materials Response (IS-810) - NCP, National Oil and Gas Hazardous Substances Pollution Contingency Plan by Progressive Management
Cover of the book Spy Satellite Encyclopedia: The Amazing History of the Early Photoreconnaissance Satellites by Progressive Management
Cover of the book A Need to Know: The Role of Air Force Reconnaissance in War Planning, 1945-1953 - Radar Principles, World War I and II, Korean War by Progressive Management
Cover of the book 2013 Master Guide to Syria and the Syrian Chemical Weapons Crisis: Threat of U.S. Military Strike by Obama, Congressional Options, Sarin Nerve Gas, Civil War, Rebel Groups, Bashar al-Assad by Progressive Management
Cover of the book 21st Century U.S. Military Manuals: Chemical Operations Principles and Fundamentals - FM 3-100 (Value-Added Professional Format Series) by Progressive Management
Cover of the book 21st Century U.S. Military Manuals: Convoy Survivability Training Support Package - Defense Against Improvised Explosive Devices (IED) and Roadside Bombs (Professional Format Series) by Progressive Management
Cover of the book Historic Reclamation Projects: Project Skywater - Rainmaking, Weather Modification, History and Politics, Technology, Testing, and Implementation by Progressive Management
We use our own "cookies" and third party cookies to improve services and to see statistical information. By using this website, you agree to our Privacy Policy