NASA's Management of the Mars Science Laboratory Project (MSL): Inspector General Report on Technical and Financial Problems with Mars Exploration Program Rover

Nonfiction, Science & Nature, Science, Physics, Astronomy, Social & Cultural Studies, Political Science, Government
Cover of the book NASA's Management of the Mars Science Laboratory Project (MSL): Inspector General Report on Technical and Financial Problems with Mars Exploration Program Rover by Progressive Management, Progressive Management
View on Amazon View on AbeBooks View on Kobo View on B.Depository View on eBay View on Walmart
Author: Progressive Management ISBN: 9781458176264
Publisher: Progressive Management Publication: June 9, 2011
Imprint: Smashwords Edition Language: English
Author: Progressive Management
ISBN: 9781458176264
Publisher: Progressive Management
Publication: June 9, 2011
Imprint: Smashwords Edition
Language: English

NASA's Office of Inspector General issued this status report on the Mars Science Laboratory (MSL) slated for launch in late 2011. The Mars Science Laboratory (MSL), part of the Science Mission Directorate’s Mars Exploration Program (Mars Program), is the most technologically challenging interplanetary rover ever designed. This NASA flagship mission, whose life-cycle costs are currently estimated at approximately $2.5 billion, will employ an array of new technologies to adjust its flight while descending through the Martian atmosphere, including a sky crane touchdown system that will lower the rover on a tether to the Martian surface.

The report states: Project managers expected to complete integration of equipment by May 2011 and ship MSL to Kennedy for flight preparation by June 2011. However, of the ten issues Project managers identified as contributing to the launch delay, as of March 2011 three remained unresolved: contamination of rock and soil samples collected by the Sample Acquisition/Sample Processing and Handling (SA/SPaH) subsystem and development of flight software and the fault protection systems. The resolution of these and other issues that may arise during final integration is likely to strain the already limited margin managers built into the Project’s schedule to allow for unanticipated delays. Moreover, since November 2009 this schedule margin has been decreasing at a rate greater than planned. Fault protection enables an instrument or system that does not operate as expected to operate at a reduced level rather than fail completely. In addition, approximately 1,200 reports of problems and failures observed by Project personnel remained open as of February 2011. If these reports are not resolved prior to launch, there is a possibility that an unknown risk could materialize and negatively affect mission success. Finally, since the 2009 decision to delay launch, the Project has received three budget increases, most recently an infusion of $71 million in December 2010. However, in our judgment because Project managers did not adequately consider historical cost trends when estimating the amount required to complete development, we believe the Project may require additional funds to meet the 2011 scheduled launch date.

View on Amazon View on AbeBooks View on Kobo View on B.Depository View on eBay View on Walmart

NASA's Office of Inspector General issued this status report on the Mars Science Laboratory (MSL) slated for launch in late 2011. The Mars Science Laboratory (MSL), part of the Science Mission Directorate’s Mars Exploration Program (Mars Program), is the most technologically challenging interplanetary rover ever designed. This NASA flagship mission, whose life-cycle costs are currently estimated at approximately $2.5 billion, will employ an array of new technologies to adjust its flight while descending through the Martian atmosphere, including a sky crane touchdown system that will lower the rover on a tether to the Martian surface.

The report states: Project managers expected to complete integration of equipment by May 2011 and ship MSL to Kennedy for flight preparation by June 2011. However, of the ten issues Project managers identified as contributing to the launch delay, as of March 2011 three remained unresolved: contamination of rock and soil samples collected by the Sample Acquisition/Sample Processing and Handling (SA/SPaH) subsystem and development of flight software and the fault protection systems. The resolution of these and other issues that may arise during final integration is likely to strain the already limited margin managers built into the Project’s schedule to allow for unanticipated delays. Moreover, since November 2009 this schedule margin has been decreasing at a rate greater than planned. Fault protection enables an instrument or system that does not operate as expected to operate at a reduced level rather than fail completely. In addition, approximately 1,200 reports of problems and failures observed by Project personnel remained open as of February 2011. If these reports are not resolved prior to launch, there is a possibility that an unknown risk could materialize and negatively affect mission success. Finally, since the 2009 decision to delay launch, the Project has received three budget increases, most recently an infusion of $71 million in December 2010. However, in our judgment because Project managers did not adequately consider historical cost trends when estimating the amount required to complete development, we believe the Project may require additional funds to meet the 2011 scheduled launch date.

More books from Progressive Management

Cover of the book Russia's Homegrown Insurgency: Jihad in the North Caucasus - Salafi Islamist Terrorism Challenge, Caucasus Emirate (CE), Chechen Insurgency, Putin Policy, Ethnic Circassian and Akhaz fighters by Progressive Management
Cover of the book Eisenhower: The Leadership Development of Dwight D. Eisenhower and George S. Patton Jr., Military Education, Mentorship, Self-Development, Determination, Ike's Years with MacArthur, Patton in Combat by Progressive Management
Cover of the book NSA Secrets Declassified: The History of Traffic Analysis: World War I - Vietnam, Signals Intelligence (SIGINT), Communications Intelligence (COMMINT), World War II, Cold War, Cryptanalysis by Progressive Management
Cover of the book 21st Century U.S. Military Documents: Air Force Operations in a Chemical, Biological, Radiological, Nuclear, and High-Yield Explosive (CBRNE) Environment, Counter CBRNE, WMD, NBC Weapons by Progressive Management
Cover of the book Army National Guard (ARNG) Special Forces (SF) Units: The Standard and the Future - Special Operations for Unconventional Warfare, Core Competencies, Soldier's Personal Perspective by Progressive Management
Cover of the book Reclamation: Managing Water in the West - The Bureau of Reclamation: From Developing to Managing Water, 1945-2000, Volume 2 - Part 1: Hells Canyon, Columbia, Utah, Arizona, Fish versus Dams by Progressive Management
Cover of the book 21st Century FEMA Study Course: Emergency Support Function #9 Search and Rescue (IS-809) - Search and Rescue (SAR), Urban (US+R), Coast Guard, Structural Collapse by Progressive Management
Cover of the book NASA Report: Sleep on Earth and in Space: Risk Factors, Health and Performance Outcomes, and Countermeasures - Workshop on Lessons Learned from ISS Space Station and Shuttle Human Flights by Progressive Management
Cover of the book End State: Relevant in Stability Operations? Operations Other than War (OOTW), Case Studies of Bosnia, Kosovo, Improvements to Army and Joint Doctrine, Strategy, Operational Planning by Progressive Management
Cover of the book 21st Century U.S. Military Manuals: Instrument Flight for Army Aviators - Field Manual 3-04.240 (FM 1-240) Part 2 - Techniques for Instrument Flying and Air Navigation, Weather, Emergency Operations by Progressive Management
Cover of the book 21st Century U.S. Military Manuals: The United States Army Functional Concept for Mission Command 2016-2028 - TRADOC 525-3-3 - Intertheater and Intratheater Maneuver (Professional Format Series) by Progressive Management
Cover of the book The Russian Navy: A Historic Transition - Official U.S. Navy Intelligence Report on New Developments Shaping Russia's Navy and Operations in the 21st Century, Review of Ships, Weapons, Leadership by Progressive Management
Cover of the book The United States Air Force (USAF): Basic Documents on Roles and Missions (Air Staff Historical Study) - McNamara, Curtis LeMay, James Forrestal, Space Command, Key West Agreement by Progressive Management
Cover of the book 21st Century FEMA Study Course: Emergency Support Function #7 Logistics Management and Resource Support (IS-807) - Material, Transportation, Facilities, Personal Property by Progressive Management
Cover of the book NASA's Efforts to Identify Near-Earth Objects (NEOs) and Mitigate Hazards - Asteroids, Meteors, Comets, Chelyabinsk-type Events, Problems with NEO Program, Management Issues by Progressive Management
We use our own "cookies" and third party cookies to improve services and to see statistical information. By using this website, you agree to our Privacy Policy