Skylab Mission Report: Second Visit - 1973 Space Station Mission by Bean, Garriott, and Lousma, Mission Activities, Hardware, Anomalies, Science Experiments, Crew Health, EVAs

Nonfiction, Science & Nature, Technology, Aeronautics & Astronautics, Science, Physics, Astrophysics & Space Science
Cover of the book Skylab Mission Report: Second Visit - 1973 Space Station Mission by Bean, Garriott, and Lousma, Mission Activities, Hardware, Anomalies, Science Experiments, Crew Health, EVAs by Progressive Management, Progressive Management
View on Amazon View on AbeBooks View on Kobo View on B.Depository View on eBay View on Walmart
Author: Progressive Management ISBN: 9781476295763
Publisher: Progressive Management Publication: May 18, 2012
Imprint: Smashwords Edition Language: English
Author: Progressive Management
ISBN: 9781476295763
Publisher: Progressive Management
Publication: May 18, 2012
Imprint: Smashwords Edition
Language: English

This official NASA internal document - converted for accurate flowing-text ebook format reproduction - is a comprehensive evaluation of the operational and engineering aspects of the second manned visit to the Skylab space station and includes the performance of experiment hardware that is under Johnson Space Center management; the crew's evaluation of the visit; and other visit-related items of interest such as medical aspects and hardware anomalies.

The space vehicle, consisting of a modified Apollo command and service module payload on a Saturn IB launch vehicle, was inserted into a 231.3 by 154.7 kilometer orbit. Rendezvous maneuvers were performed during the first five orbits as planned. During the rendezvous, the command and service module reaction control system forward firing engine (quad B) oxidizer valve leaked. The quad was isolated. Stationkeeping with the Saturn Workshop began approximately 8 hours after lift-off with docking being performed about 30 minutes later.

The crewmen experienced motion sickness during the first three visit days. Consequently, the Saturn Workshop activation and experiment implementation activities were curtailed. By adjusting the crew's diet and maintaining a low work load, the crew was able to complete the adjustment to space flight in 5 days, after which the flight activities were returned to normal.

The first extravehicular activity was delayed to visit day 10 because of the crew's motion sickness. The extravehicular activity lasted almost 6.5 hours during which time the crew changed the Apollo Telescope Mount film, deployed the twin-pole sun shield, inspected and performed repair work on the S055 (Ultraviolet Spectrometer) experiment, deployed the S149 (Particle Collection) experiment, and installed the calibration shield from experiment S230 (Magnetospheric Particle Composition). A second extravehicular activity was performed on visit day 28 and lasted 4 hours and 30 minutes. A third extravehicular activity was accomplished on visit day 57 with a duration of 2 hours and 45 minutes to retrieve the expended film on the Apollo Telescope Mount solar experiments and experiments S230 and S149. Earth Resources Experiment Package activities included 39 passes with a total of 930 minutes of data. All experiment coverage was normal with the exception of the loss of experiment S193 (Microwave Radiometer/Scatterometer and Altimeter) when the antenna failed to operate during data pass 29. A series of medical experiments was accomplished which assessed the effect of a 59-day duration space mission on the crewmen. Included were a hematology and immunology program, a mineral balance assessment, an evaluation of the changes in hormonal and associated fluid and electrolyte parameters, the extent of bone mineral loss, the cardiovascular effects utilizing the lower body negative pressure experiment and the vectorcardiogram, and an assessment of the metabolic activity.

View on Amazon View on AbeBooks View on Kobo View on B.Depository View on eBay View on Walmart

This official NASA internal document - converted for accurate flowing-text ebook format reproduction - is a comprehensive evaluation of the operational and engineering aspects of the second manned visit to the Skylab space station and includes the performance of experiment hardware that is under Johnson Space Center management; the crew's evaluation of the visit; and other visit-related items of interest such as medical aspects and hardware anomalies.

The space vehicle, consisting of a modified Apollo command and service module payload on a Saturn IB launch vehicle, was inserted into a 231.3 by 154.7 kilometer orbit. Rendezvous maneuvers were performed during the first five orbits as planned. During the rendezvous, the command and service module reaction control system forward firing engine (quad B) oxidizer valve leaked. The quad was isolated. Stationkeeping with the Saturn Workshop began approximately 8 hours after lift-off with docking being performed about 30 minutes later.

The crewmen experienced motion sickness during the first three visit days. Consequently, the Saturn Workshop activation and experiment implementation activities were curtailed. By adjusting the crew's diet and maintaining a low work load, the crew was able to complete the adjustment to space flight in 5 days, after which the flight activities were returned to normal.

The first extravehicular activity was delayed to visit day 10 because of the crew's motion sickness. The extravehicular activity lasted almost 6.5 hours during which time the crew changed the Apollo Telescope Mount film, deployed the twin-pole sun shield, inspected and performed repair work on the S055 (Ultraviolet Spectrometer) experiment, deployed the S149 (Particle Collection) experiment, and installed the calibration shield from experiment S230 (Magnetospheric Particle Composition). A second extravehicular activity was performed on visit day 28 and lasted 4 hours and 30 minutes. A third extravehicular activity was accomplished on visit day 57 with a duration of 2 hours and 45 minutes to retrieve the expended film on the Apollo Telescope Mount solar experiments and experiments S230 and S149. Earth Resources Experiment Package activities included 39 passes with a total of 930 minutes of data. All experiment coverage was normal with the exception of the loss of experiment S193 (Microwave Radiometer/Scatterometer and Altimeter) when the antenna failed to operate during data pass 29. A series of medical experiments was accomplished which assessed the effect of a 59-day duration space mission on the crewmen. Included were a hematology and immunology program, a mineral balance assessment, an evaluation of the changes in hormonal and associated fluid and electrolyte parameters, the extent of bone mineral loss, the cardiovascular effects utilizing the lower body negative pressure experiment and the vectorcardiogram, and an assessment of the metabolic activity.

More books from Progressive Management

Cover of the book The Rise and Fall of Dyna-Soar: A History of Air Force Hypersonic R&D, 1944-1963 - Pathfinding Effort to Develop a Transatmospheric Boost Glider and Spaceplane, Manned Military Space Program by Progressive Management
Cover of the book Art of War Paper: Operations at the Border - Efforts to Disrupt Insurgent Safe-Havens, Dhofar, Oman, Insurgency, Counterinsurgency by Progressive Management
Cover of the book National Defense Intelligence College Paper: Beneath the Surface - Intelligence Preparation of the Battlespace for Counterterrorism - bin Laden, al-Qaida, Jihad, Horn of Africa, Hezbollah by Progressive Management
Cover of the book Never Let the Opportunity to Prepare for a Crisis Go to Waste: The Need for Proactive Measures in the Asia-Pacific Region and Pacific Command (PACOM) to Mitigate the Impacts of Climate Change by Progressive Management
Cover of the book 21st Century U.S. Military Manuals: Rail Transport in a Theater of Operations Field Manual - FM 55-20 (Value-Added Professional Format Series) by Progressive Management
Cover of the book Ultimate Guide to the Patient Protection and Affordable Care Act (PPACA or ACA) - Understanding Obamacare and Your Health Care Insurance Options, New Plans, Programs, Bill of Rights by Progressive Management
Cover of the book 21st Century Essential References: Beverage Alcohol Manual (BAM) for Wine, Distilled Spirits, Malt Beverages, Beer, Practical Guide to Label Regulations, Ingredients, Treasury Department ATF by Progressive Management
Cover of the book Operational Art in Pontiac's War: 1763 Pan-Indian Movement Attack on British Forts in Great Lakes Region, Pays d'en Haut and the Ottawa Chief Pontiac, Bradstreet and Bouquet Campaigns by Progressive Management
Cover of the book They Served Here: Thirty-Three Maxwell Men - Maxwell Air Force Base, Claire Chennault, Clark Gable, Glenn Miller, Henry Hugh Shelton, Hoyt Vandenberg, Curtis LeMay by Progressive Management
Cover of the book Marines in the Korean War Commemorative Series: Outpost War - U.S. Marines from the Nevada Battles to the Armistice by Progressive Management
Cover of the book China's Response to the Global Financial Crisis: Examining the Incentives Behind China's Stimulus Package - Economic, Social, and Political Argument Impacting Chinese Communist Party (CCP) Perception by Progressive Management
Cover of the book Not All Reforms Are Big: The Development of the Field Staff during the Root Era Reforms: Professionalism in Spanish-American War in 1898, Cuban and Philippine Campaign, Pershing’s Punitive Expedition by Progressive Management
Cover of the book Complete Guide to America's Navy and the Space Program: Early Satellites to Current Defense Systems, Manned Programs (Shepard, Mercury, MOL, Apollo), Recovery, From the Sea to the Stars 2010 Edition by Progressive Management
Cover of the book 2015 Complete Guide to Operation Inherent Resolve: America's War Against the Islamic State, ISIS, ISIL Terrorists in Iraq and Syria, Leader al-Baghdadi, Levant, al-Qaeda in Syria by Progressive Management
Cover of the book Eliminating War by Eliminating Warriors: A Case Study in Costa Rica - Abolishing the Military and Army, Culture, Economic Evolution, Domestic Developments, External Threats, Historical Foundations by Progressive Management
We use our own "cookies" and third party cookies to improve services and to see statistical information. By using this website, you agree to our Privacy Policy