Skylab Mission Report: Second Visit - 1973 Space Station Mission by Bean, Garriott, and Lousma, Mission Activities, Hardware, Anomalies, Science Experiments, Crew Health, EVAs

Nonfiction, Science & Nature, Technology, Aeronautics & Astronautics, Science, Physics, Astrophysics & Space Science
Cover of the book Skylab Mission Report: Second Visit - 1973 Space Station Mission by Bean, Garriott, and Lousma, Mission Activities, Hardware, Anomalies, Science Experiments, Crew Health, EVAs by Progressive Management, Progressive Management
View on Amazon View on AbeBooks View on Kobo View on B.Depository View on eBay View on Walmart
Author: Progressive Management ISBN: 9781476295763
Publisher: Progressive Management Publication: May 18, 2012
Imprint: Smashwords Edition Language: English
Author: Progressive Management
ISBN: 9781476295763
Publisher: Progressive Management
Publication: May 18, 2012
Imprint: Smashwords Edition
Language: English

This official NASA internal document - converted for accurate flowing-text ebook format reproduction - is a comprehensive evaluation of the operational and engineering aspects of the second manned visit to the Skylab space station and includes the performance of experiment hardware that is under Johnson Space Center management; the crew's evaluation of the visit; and other visit-related items of interest such as medical aspects and hardware anomalies.

The space vehicle, consisting of a modified Apollo command and service module payload on a Saturn IB launch vehicle, was inserted into a 231.3 by 154.7 kilometer orbit. Rendezvous maneuvers were performed during the first five orbits as planned. During the rendezvous, the command and service module reaction control system forward firing engine (quad B) oxidizer valve leaked. The quad was isolated. Stationkeeping with the Saturn Workshop began approximately 8 hours after lift-off with docking being performed about 30 minutes later.

The crewmen experienced motion sickness during the first three visit days. Consequently, the Saturn Workshop activation and experiment implementation activities were curtailed. By adjusting the crew's diet and maintaining a low work load, the crew was able to complete the adjustment to space flight in 5 days, after which the flight activities were returned to normal.

The first extravehicular activity was delayed to visit day 10 because of the crew's motion sickness. The extravehicular activity lasted almost 6.5 hours during which time the crew changed the Apollo Telescope Mount film, deployed the twin-pole sun shield, inspected and performed repair work on the S055 (Ultraviolet Spectrometer) experiment, deployed the S149 (Particle Collection) experiment, and installed the calibration shield from experiment S230 (Magnetospheric Particle Composition). A second extravehicular activity was performed on visit day 28 and lasted 4 hours and 30 minutes. A third extravehicular activity was accomplished on visit day 57 with a duration of 2 hours and 45 minutes to retrieve the expended film on the Apollo Telescope Mount solar experiments and experiments S230 and S149. Earth Resources Experiment Package activities included 39 passes with a total of 930 minutes of data. All experiment coverage was normal with the exception of the loss of experiment S193 (Microwave Radiometer/Scatterometer and Altimeter) when the antenna failed to operate during data pass 29. A series of medical experiments was accomplished which assessed the effect of a 59-day duration space mission on the crewmen. Included were a hematology and immunology program, a mineral balance assessment, an evaluation of the changes in hormonal and associated fluid and electrolyte parameters, the extent of bone mineral loss, the cardiovascular effects utilizing the lower body negative pressure experiment and the vectorcardiogram, and an assessment of the metabolic activity.

View on Amazon View on AbeBooks View on Kobo View on B.Depository View on eBay View on Walmart

This official NASA internal document - converted for accurate flowing-text ebook format reproduction - is a comprehensive evaluation of the operational and engineering aspects of the second manned visit to the Skylab space station and includes the performance of experiment hardware that is under Johnson Space Center management; the crew's evaluation of the visit; and other visit-related items of interest such as medical aspects and hardware anomalies.

The space vehicle, consisting of a modified Apollo command and service module payload on a Saturn IB launch vehicle, was inserted into a 231.3 by 154.7 kilometer orbit. Rendezvous maneuvers were performed during the first five orbits as planned. During the rendezvous, the command and service module reaction control system forward firing engine (quad B) oxidizer valve leaked. The quad was isolated. Stationkeeping with the Saturn Workshop began approximately 8 hours after lift-off with docking being performed about 30 minutes later.

The crewmen experienced motion sickness during the first three visit days. Consequently, the Saturn Workshop activation and experiment implementation activities were curtailed. By adjusting the crew's diet and maintaining a low work load, the crew was able to complete the adjustment to space flight in 5 days, after which the flight activities were returned to normal.

The first extravehicular activity was delayed to visit day 10 because of the crew's motion sickness. The extravehicular activity lasted almost 6.5 hours during which time the crew changed the Apollo Telescope Mount film, deployed the twin-pole sun shield, inspected and performed repair work on the S055 (Ultraviolet Spectrometer) experiment, deployed the S149 (Particle Collection) experiment, and installed the calibration shield from experiment S230 (Magnetospheric Particle Composition). A second extravehicular activity was performed on visit day 28 and lasted 4 hours and 30 minutes. A third extravehicular activity was accomplished on visit day 57 with a duration of 2 hours and 45 minutes to retrieve the expended film on the Apollo Telescope Mount solar experiments and experiments S230 and S149. Earth Resources Experiment Package activities included 39 passes with a total of 930 minutes of data. All experiment coverage was normal with the exception of the loss of experiment S193 (Microwave Radiometer/Scatterometer and Altimeter) when the antenna failed to operate during data pass 29. A series of medical experiments was accomplished which assessed the effect of a 59-day duration space mission on the crewmen. Included were a hematology and immunology program, a mineral balance assessment, an evaluation of the changes in hormonal and associated fluid and electrolyte parameters, the extent of bone mineral loss, the cardiovascular effects utilizing the lower body negative pressure experiment and the vectorcardiogram, and an assessment of the metabolic activity.

More books from Progressive Management

Cover of the book Air Power History from Infancy, World Wars, to the Present, Pioneers, USAF and Foreign Air Forces: A Companion for Aspirant Air Warriors: A Handbook for Personal Professional Study by Progressive Management
Cover of the book Rebalance to the Pacific: Case for Greater Amphibious Capabilities in U.S. Army – Response to Geopolitical Tensions with China, Anti-access/Area Denial in Asia-Pacific, Operation Chromite Case Study by Progressive Management
Cover of the book Improved Intelligence Warning in an Age of Complexity: IC Community, CIA, DIA, DNI, FBI Interagency Analysis and Failures, Complex Adaptive Systems to Develop Novel Responses to Threats by Progressive Management
Cover of the book 21st Century U.S. Military Documents: Air Force E-3 AWACS Sentry Aircraft - Operations Procedures, Aircrew Evaluation Criteria, Aircrew Training Flying Operations by Progressive Management
Cover of the book U.S. Marines In Iraq, 2003: Combat Service Support During Operation Iraqi Freedom - U.S. Marines in the Global War on Terrorism - Taking Baghdad and Tikrit, Special Purpose MAGTF by Progressive Management
Cover of the book Apollo and America's Moon Landing Program: Lunar Scientist Oral Histories, including George Carruthers, Edgar Cortright, Farouk El-Baz, James Head, Wilmot Hess, William Muehlberger, Leon Silver by Progressive Management
Cover of the book Command and Control of Military Forces in the Homeland: Lack of Unity of Effort between National Guard and Federal Military Forces in Disasters and WMD Incidents, Posse Comitatus, Hurricane Katrina by Progressive Management
Cover of the book 21st Century FEMA Study Course: Emergency Support Function #3 Public Works and Engineering (IS-803) - U.S. Army Corps of Engineers (USACE), ENGlink by Progressive Management
Cover of the book Selected Works of General John Vessey, Joint Chiefs of Staff Chairman, Soviet Union, Reagan Era, Cold War, Lebanon Bombing, Nuclear Modernization, Grenada, SDI, Peacekeeper Missile by Progressive Management
Cover of the book 21st Century U.S. Military Documents: Air Force C-5 Galaxy Military Transport Aircraft - Operations Procedures, Aircrew Evaluation Criteria, Aircrew Training Flying Operations by Progressive Management
Cover of the book Gender Integration of Women into U.S. Army Special Forces Operational Detachments Alpha (As 18-Series Military Occupational Specialty) - Results of Research Surveys and Historical Account Analysis by Progressive Management
Cover of the book Weapon of Choice: ARSOF in Afghanistan (Army Special Operations Forces) - 9/11 Attacks, Toppling the Taliban, Osama bin Laden, Destroying al-Qaeda in the War on Terror, First Round of Afghan War by Progressive Management
Cover of the book Sowing the Seeds of Soft Power: The United States and India in the Next Great Game - Eurasia, Indian Domestic Values and Culture, Hollywood to Bollywood, Fight Against Terrorism, Nuclear Weapons by Progressive Management
Cover of the book 2012 Navy Program Guide: Major Systems, Programs, Ships, Submarines, Aircraft, Carriers, Weapons, Electronics, Sensors, Surface Combatants, Expeditionary Forces, Data Systems - Bonus 2011 Edition by Progressive Management
Cover of the book History of the Joint Chiefs of Staff: The Prelude to the War in Vietnam 1954-1959 - North and South Vietnam, Geneva Conference, Collins Mission by Progressive Management
We use our own "cookies" and third party cookies to improve services and to see statistical information. By using this website, you agree to our Privacy Policy