Space Shuttle NASA Mission Reports: 1983 and 1984 Missions, STS-7, STS-8, STS-9, STS 41-B, STS 41-C, STS-41-D, STS 41-G, STS 51-A

Nonfiction, Science & Nature, Science, Physics, Astronomy, History, Americas
Cover of the book Space Shuttle NASA Mission Reports: 1983 and 1984 Missions, STS-7, STS-8, STS-9, STS 41-B, STS 41-C, STS-41-D, STS 41-G, STS 51-A by Progressive Management, Progressive Management
View on Amazon View on AbeBooks View on Kobo View on B.Depository View on eBay View on Walmart
Author: Progressive Management ISBN: 9781465736277
Publisher: Progressive Management Publication: December 22, 2011
Imprint: Smashwords Edition Language: English
Author: Progressive Management
ISBN: 9781465736277
Publisher: Progressive Management
Publication: December 22, 2011
Imprint: Smashwords Edition
Language: English

These official final orbiter mission reports issued by the NASA Johnson Space Center cover missions in 1982 and 1983: STS-7, STS-8, STS-9, STS 41-B, STS 41-C, STS-41-D, STS 41-G, STS 51-A. In these thorough reports, with information and specifics not available on NASA website mission descriptions, each orbiter system is reviewed in detail along with technical information on performance and anomalies.

STS-7: The STS-7 flight was launched on June 18, 1983 and landed at Edwards AFB, CA. The crew for this flight, the largest number ever flown, were Captain R. L. Crippen, Commander; Captain F. H. Hauck, Pilot; and Colonel J. M. Fabian and S. K. Ride, PhD., Mission Specialists; and N. E. Thagard, M.D., Medical Specialist.

STS-8: The STS-8 flight was launched on August 30, 1983 and landed at Edwards on September 6. STS-8 provided the first night launch and landing of the Program. The crew for this fourth operational flight was Capt. R. H. Truly, Commander; Cdr. D. C. Brandenstein, Pilot; Lt. Col. G. S. Bluford, and Lt. Cdr. D. A. Gardner, Mission Specialists; and W. E. Thornton, M.D., Medical Specialist.

STS-9: The STS-9 flight, the first flight of the European-Space-Agency built Spacelab, was launched on November 28, 198 and landed at Edwards on December 8, 1983. This flight was launched on the most northern inclination (57 deg.) of any U.S. manned flight. The 6-man crew for this Spacelab mission, the largest crew ever flown, was composed of four astronauts and two non-astronaut payload specialists, one of whom was the first foreign person to be launched by the U.S.

STS 41-B: The STS-41B flight was launched from Launch Complex 39 and landed at the KSC SLF on February 11, 1984. This flight ended with the completion of one of the last major test objectives of the program, that of landing at the Kennedy Space Center.

STS 41-C: The STS 41-C flight was launched on April 6, 1984 and landed at Edwards on April 13, 1984. This flight was scheduled as a 6-day mission, but SMM retrieval problems during flight day 3 operations resulted in extending the mission 1 day for a total of 7 days. Also, this flight was scheduled to land at the Kennedy Space Center Shuttle Landing Facility; however, the possibility of adverse weather (rain) resulted in a decision to land at Edwards AFB, California.

STS-41-D: The STS 41-D mission, the first for the OV-103 vehicle, Discovery, was scheduled for launch on June 25, 1984, and June 26, 1984, and August 29, 1984. The attempted launch on June 25, 1984, was scrubbed because GPC-5 (general purpose computer-5), which contained the backup flight system software, exhibited two memory parity errors at T-32 minutes.

STS 41-G: The STS 41-G mission, the sixth flight for the OV-099 vehicle, Challenger, was launched from Launch Complex 39A on October 5, 1984. In the areas of payloads and experiments, all except the SIR (Shuttle Imaging Radar) accomplished essentially all of their objectives. The crew for this flight were Robert L. Crippen, Captain, USN, Commander; Jon A. McBride, Commander, USN, Pilot; Sally K. Ride, PhD., Kathryn D. Sullivan, PhD., and David C. Leetsma, Lt. Cdr., USN, Mission Specialists; Paul D. Scully-Power, PhD., Payload Specialist; and Marc Garneau, PhD., Canadian Payload Specialist.

STS 51-A: The STS 51-A mission was scheduled for launch on November 7, 1984, but the launch was scrubbed during the planned hold at T-20 minutes because the data indicated that the predicted winds-aloft would apply shear loads in excess of the design limits of the vehicle. The final countdown culminated in a successful launch from launch complex 39A on November 8, 1984, and the mission was completed with a landing at the KSC SLF on November 16, 1984.

View on Amazon View on AbeBooks View on Kobo View on B.Depository View on eBay View on Walmart

These official final orbiter mission reports issued by the NASA Johnson Space Center cover missions in 1982 and 1983: STS-7, STS-8, STS-9, STS 41-B, STS 41-C, STS-41-D, STS 41-G, STS 51-A. In these thorough reports, with information and specifics not available on NASA website mission descriptions, each orbiter system is reviewed in detail along with technical information on performance and anomalies.

STS-7: The STS-7 flight was launched on June 18, 1983 and landed at Edwards AFB, CA. The crew for this flight, the largest number ever flown, were Captain R. L. Crippen, Commander; Captain F. H. Hauck, Pilot; and Colonel J. M. Fabian and S. K. Ride, PhD., Mission Specialists; and N. E. Thagard, M.D., Medical Specialist.

STS-8: The STS-8 flight was launched on August 30, 1983 and landed at Edwards on September 6. STS-8 provided the first night launch and landing of the Program. The crew for this fourth operational flight was Capt. R. H. Truly, Commander; Cdr. D. C. Brandenstein, Pilot; Lt. Col. G. S. Bluford, and Lt. Cdr. D. A. Gardner, Mission Specialists; and W. E. Thornton, M.D., Medical Specialist.

STS-9: The STS-9 flight, the first flight of the European-Space-Agency built Spacelab, was launched on November 28, 198 and landed at Edwards on December 8, 1983. This flight was launched on the most northern inclination (57 deg.) of any U.S. manned flight. The 6-man crew for this Spacelab mission, the largest crew ever flown, was composed of four astronauts and two non-astronaut payload specialists, one of whom was the first foreign person to be launched by the U.S.

STS 41-B: The STS-41B flight was launched from Launch Complex 39 and landed at the KSC SLF on February 11, 1984. This flight ended with the completion of one of the last major test objectives of the program, that of landing at the Kennedy Space Center.

STS 41-C: The STS 41-C flight was launched on April 6, 1984 and landed at Edwards on April 13, 1984. This flight was scheduled as a 6-day mission, but SMM retrieval problems during flight day 3 operations resulted in extending the mission 1 day for a total of 7 days. Also, this flight was scheduled to land at the Kennedy Space Center Shuttle Landing Facility; however, the possibility of adverse weather (rain) resulted in a decision to land at Edwards AFB, California.

STS-41-D: The STS 41-D mission, the first for the OV-103 vehicle, Discovery, was scheduled for launch on June 25, 1984, and June 26, 1984, and August 29, 1984. The attempted launch on June 25, 1984, was scrubbed because GPC-5 (general purpose computer-5), which contained the backup flight system software, exhibited two memory parity errors at T-32 minutes.

STS 41-G: The STS 41-G mission, the sixth flight for the OV-099 vehicle, Challenger, was launched from Launch Complex 39A on October 5, 1984. In the areas of payloads and experiments, all except the SIR (Shuttle Imaging Radar) accomplished essentially all of their objectives. The crew for this flight were Robert L. Crippen, Captain, USN, Commander; Jon A. McBride, Commander, USN, Pilot; Sally K. Ride, PhD., Kathryn D. Sullivan, PhD., and David C. Leetsma, Lt. Cdr., USN, Mission Specialists; Paul D. Scully-Power, PhD., Payload Specialist; and Marc Garneau, PhD., Canadian Payload Specialist.

STS 51-A: The STS 51-A mission was scheduled for launch on November 7, 1984, but the launch was scrubbed during the planned hold at T-20 minutes because the data indicated that the predicted winds-aloft would apply shear loads in excess of the design limits of the vehicle. The final countdown culminated in a successful launch from launch complex 39A on November 8, 1984, and the mission was completed with a landing at the KSC SLF on November 16, 1984.

More books from Progressive Management

Cover of the book Al-Qaida, the Tribes, and the Government: Lessons and Prospects for Iraq's Unstable Triangle, Middle East Studies Paper, al-Qaeda, the Awakening by Progressive Management
Cover of the book 2018 Venezuela: A Revolution on Standby - Socialist Leadership of Hugo Chavez and Nicolas Maduro Resulting in Hyperinflation, Food and Energy Crises, Violent Protests, Corruption, and Purges by Progressive Management
Cover of the book Pathbreakers: U.S. Marine African American Officers in Their Own Words - Oral History Anthology with 21 Personal Accounts Covering 60 Years of Service - NASA Administrator Charles Bolden, Jr. by Progressive Management
Cover of the book The United States Air Force in Southeast Asia: Civic Action - Vietnam War, Nation Building Amid Instability, Pacification, Tet Offensive, President Kennedy, Johnson by Progressive Management
Cover of the book Preparing for Upheaval in North Korea: Assuming North Korean Regime Collapse - Kim Family, Democratic People's Republic of Korea (DPRK), Songbun System, Juche Ideology, Pyongyang by Progressive Management
Cover of the book Bombs Over Bosnia: The Role of Airpower in Bosnia-Herzegovina - NATO Operation Deny Flight, Serbs and the Death of Yugoslavia, Deterrent Use of Airpower, Deliberate Force, Dayton Peace Accord by Progressive Management
Cover of the book Medical Management of Radiological Casualties: Third Edition 2010 - Ionizing Radiation and Radionuclide Emergency Treatment, Acute Radiation Syndrome, Skin Injuries, Decontamination, Delayed Effects by Progressive Management
Cover of the book So Many, So Much, So Far, So Fast: U.S. Transportation Command and Strategic Deployment for Operation Desert Shield / Desert Storm, Airlift, Sealift, Overland Transport by Progressive Management
Cover of the book 21st Century U.S. Military Manuals: Combatives Field Manual - FM 3-25.150, FM 21-150 (Value-Added Professional Format Series) by Progressive Management
Cover of the book United States Postal Service: A Sustainable Path Forward - 2018 Task Force on the USPS Report: Universal Service Obligation, International Models, Mail and Package Markets, Long-term Liabilities by Progressive Management
Cover of the book Recommendation for a National Standard for Tactical Emergency Casualty Care and Israeli Hospital Trauma Protocols in the United States: Active Shooter and Terrorist Attacks, EMS Protocol Deficiencies by Progressive Management
Cover of the book Bangladesh in Perspective: Orientation Guide and Bengali Cultural Orientation: Geography, History, Economy, Security, Customs, Islam, Hinduism, Textiles, Ganges, Jamuna River, Chittagong, Keokradang by Progressive Management
Cover of the book Energy Development and Permitting in Alaska: Managing for the Future in a Rapidly Changing Arctic - Oil and Gas, Mining, Shipping and Fisheries, Global Warming and Climate Change by Progressive Management
Cover of the book History of the Office of the Secretary of Defense, Volume Five: The McNamara Ascendancy 1961-1965 - Berlin Wall, Bay of Pigs Fiasco, Cuban Missile Crisis, Vietnam, Nuclear Test Ban by Progressive Management
Cover of the book Air Force Doctrine Document 3-27: Homeland Operations - NORAD, National Response Plan (NRP), Air Force National Security Emergency Preparedness Agency, Air National Guard (ANG), Posse Comitatus Act by Progressive Management
We use our own "cookies" and third party cookies to improve services and to see statistical information. By using this website, you agree to our Privacy Policy